Skip to content Skip to sidebar Skip to footer

(DOWNLOAD) "Reshaping ADR Strategies for Today's Global Engineering and Construction Market" by Faulkner Law Review " eBook PDF Kindle ePub Free

Reshaping ADR Strategies for Today's Global Engineering and Construction Market

📘 Read Now     📥 Download


eBook details

  • Title: Reshaping ADR Strategies for Today's Global Engineering and Construction Market
  • Author : Faulkner Law Review
  • Release Date : January 22, 2011
  • Genre: Law,Books,Professional & Technical,Religion & Spirituality,
  • Pages : * pages
  • Size : 64 KB

Description

In its ongoing effort to strive for an understanding of the sources of disputes, as well as for the most current information as to how disputes are being resolved and could potentially be resolved, JAMS has been conducting a series of Global Engineering & Construction (GEC) Roundtables throughout the country designed to find out directly from construction industry leaders where and why disputes are arising, how they are currently being managed, and how the recent stimulus package might play out in the construction industry. A recent GEC Roundtable was conducted in Northern California attended by the authors as GEC neutrals, JAMS staff, and our seven guests, four representatives of large public entities, and three prominent attorneys representing various "sides" of construction disputes- private owners, public owners, design professionals, and contractors. A very interactive, open, and thoughtful discussion at the Roundtable revealed the following thoughts and current issues: Starting with opinions about sources of construction disputes, incomplete or inadequate design documents were prominent in the discussion. This was not a "dump on the designer" theme, but rather a more nuanced discussion of why this is so. Owners seem to recognize the principle that there is "no set of perfect drawings," and that design budget constraints exist. Yet each drawing discrepancy can soon become an "error," and each change order requests a reason to question the design. Schedule-driven design, in both private and public settings, was also identified as a problem. Finally, rather than being interested in coordination, the contractor and designer are essentially set against each other and usually have very little interaction pre-bid.


Ebook Download "Reshaping ADR Strategies for Today's Global Engineering and Construction Market" PDF ePub Kindle